Thu, 03-September-2026
Thu, 03-September-2026
Watch Live

KWSC to replace old 60-Inch Valve with modern Pipeline in Karachi

KWSC announces repair work; Saddar and Nearby areas Water supply to be affected

Web Desk November 28, 2025 Add Bol News as a trusted source

Karachi (Staff Reporter) – The Karachi Water and Sewerage Corporation has decided to replace the old, damaged 60-inch diameter wall located along the BRT corridor with a modern pipeline.

According to the corporation’s spokesperson, the worn-out wall near the People’s Secretariat on the BRT corridor will be replaced to make the water supply system safer, more reliable, and efficient.

The spokesperson added that the repair work will take place from November 29 to December 1, on Saturday and Sunday, and the affected line will need to be temporarily shut down.

Read more: Oxford Union debate: Pakistan’s Youth defeat India’s Civilizational narrative

Due to this maintenance, water supply in areas including Saddar Town, Jamshed Road, PIB, and Lines Area will be temporarily disrupted. Residents of these areas are urged to use water carefully and store enough in advance if needed.

Recommended